Commit Graph

3 Commits (df25617e54cc68c06c7730b35f01643da3ed58e5)

Author SHA1 Message Date
zwelch df25617e54 The late birth of the NEWS file also caused me to revisit the release
process once again and reconsider it in some detail.  In doing so,
some further revisions to the process were required:
1) The URL of the repository is embedded in the released code.
   - The packages need to be created from the tagged branch.
   - The URL then points to where to get the tagged code.
2) Improve the instructions for NEWS handling.
   - NEWS file must be updated for each release; describe that process.
   - The NEWS file should be archived an recreated for each release.
3) Add detail steps for the berliOS release process.
4) Minor cleanups to release process doxygen markup.


git-svn-id: svn://svn.berlios.de/openocd/trunk@2475 b42882b7-edfa-0310-969c-e2dbd0fdcd60
2009-07-06 11:26:28 +00:00
zwelch 153270fea3 Major update to release process documentation:
- Provide overview of OpenOCD versioning schema.
- Outline responsibilities and authority of the release manager.
- Explain the need for flexibility in the release schedule.
- Add and refine the release process steps.
- Include tutorials for using new release script.
- Many more improvements, too numerous to list.


git-svn-id: svn://svn.berlios.de/openocd/trunk@2462 b42882b7-edfa-0310-969c-e2dbd0fdcd60
2009-07-04 03:47:54 +00:00
zwelch fc240afcac Commit first draft of release process documentation.
git-svn-id: svn://svn.berlios.de/openocd/trunk@2453 b42882b7-edfa-0310-969c-e2dbd0fdcd60
2009-07-02 10:54:30 +00:00