Commit Graph

9 Commits (3cd82c989c169747188bd9e8c8395c225176f50b)

Author SHA1 Message Date
Istvan Csomortani aa5fdf903e Makefile: Update makefiles 2019-08-26 16:58:01 +03:00
Arpadi 0680e44330 system_id: deployed ip 2019-08-06 16:53:11 +03:00
Istvan Csomortani a589753d92 project/scripts: Rename adi_project.tcl to adi_project_xilinx.tcl 2019-06-29 06:53:51 +03:00
Istvan Csomortani 43725429ac adi_project: Rename the process adi_project_xilinx to adi_project 2019-06-29 06:53:51 +03:00
Istvan Csomortani 019390f9bf block_design: Updates with new reset net variables 2019-06-11 18:13:06 +03:00
Istvan Csomortani 7960b00684 block_design: Update with new clock net variables
Using the new clock net variables in all Xilinx block designs.
2019-06-11 18:13:06 +03:00
Istvan Csomortani 70b7d69ff8 whitespace: Delete all trailing white spaces 2019-06-07 10:20:15 +03:00
Istvan Csomortani 6cac0b9917 makefile: Update dual_ad9208 2019-05-29 10:23:24 +03:00
Laszlo Nagy 607f2bd8de ad9208_dual_ebz: Initial version
This commit add support for the dual AD9208-DUAL-EBZ board.

The clocking scheme is different from the other projects.
The device clock (LaneRate/40) is no longer an output of the transceivers (RXOUTCLOCK),
it is received directly from the clockchip  SCLKOUT9 output through the REFCLK1.
This is needed for deterministic latency where SYSREF must be sampled
with the device clock by meeting setup and hold time.

The two channels from each converter are merged together and transferred  to the DDR with a single DMA.

It has all transceiver parameters set for a 15Gpbs lane rate and uses the QPLL.

REQUIRED HARDWARE CHANGES : The F1 2A fuse must be populated on the FMC
board.
2019-05-16 13:29:34 +03:00